1
/
of
10
3.5 Inch Car Gps Hud Display Speed Time Distance
3.5 Inch Car Gps Hud Display Speed Time Distance
Regular price
$115.00 AUD
Regular price
Sale price
$115.00 AUD
Unit price
/
per
Couldn't load pickup availability
3.5 Inch Car Locator Technology Hud Display - Speed Time Distance
Enhance Your Driving Experience With This High-Precision Locator Technology Hud Display. Designed For Quick And Accurate Vehicle Speed Updates It Provides Essential Driving Data At A Glance While Keeping Your Eyes On The Road.
Features:
- 10 Hz High Refresh Rate Locator Technology + Beidou Dual-Mode Chip: Quick And Accurate Vehicle Speed Updates.
- Speed Calibration: Match The Hud Display With Your Car Dashboard For Precise Readings.
- Multiple Interface Options: Versatile Connectivity For Different Car Setups.
- Self-Adaptive Light-Sensing: Automatically Adjusts Brightness For Natural Visibility.
- Reflection Imaging: Clear Display Without Film Or Ghosting.
- Comprehensive Display: Shows Speed Time Driving Distance Altitude Number Of Satellites And Mile Switching.
- Hybrid Power Auto Start/Stop: Supports Both Power Modes For Convenience.
Specifications:
- Refresh Rate: 10 Frames Per Second
- Power Supply: Car Usb (5V) Or Cigarette Lighter
- Speed Calibration Function
- Multiple Interface Options
- Self-Adaptive Light-Sensing
- Reflection Imaging
- Displays: Speed Time Driving Distance Altitude Number Of Satellites Mile Switching
- Supports Hybrid Power And Automatic Start/Stop
You Will Receive:
- 1 × 3.5 Inch Car Locator Technology Hud Display
Share
